The Enmark Energy 2007-2 Joint Venture consists of the Enmark RJE #1, Enmark RJE #2, Enmark RJE #3 and SWD #1 Wells in Caldwell County, Texas. The field is the Luling-Branyon Field and will consist of 4 wells in the Austin Chalk to about 2,500 feet drill depth. The program includes 20 acres and each well is situated on 5 acre spacing. The package indicates that there is The address for Enmark Energy, LLC is 555 Republic Drive #305, Plano Texas 75074.
The project is dated December of 2007 with Vice President showing to be Don Martin and Geologist Andrew Alff. William Buck (Bill Buck) is listed as the President for Enmark Energy with Margo Praytor as Business Manager. Kevin Smith is indicated as Geophysicist with Barry Gresham as Petroleum Geologist. William Locklear (Bill Locklear) is also listed as a Petroleum Engineer.
Additional References are listed as:
- Bell & Murphy & Associates
- Tri-Tex Exploration Inc.
- Foree & Robertson LLC
- Petroleum land Services
- Perkins, Dexter, Sinopoli & Hamm, PC
- Bank of America

Recent Comments